Book Title: Jain Center of America NY 2005 06 Pratishtha
Author(s): Jain Center of America NY
Publisher: USA Jain Center America NY
View full book text
________________
May 16, 2003 - Front Elevation
Shows the South elevation of the building. Note Block walls, framing and stud walls construction underway. Also notice Shikhar frame in place.
June 20, 2003
Floor
-
Fourth
Shows the fourth floor of the building. Notice duct work for air-conditioning and heating. Also notice masonry opening (windows).
NO PARKING
May 16, 2003 Floor
Fourth
Shows the fourth floor of the building. Note framing prior to sheetrock and door frame installation underway. Also notice electric conduits and drain pipes in place.
July 22, 2003 External Brickwork
Shows the West elevation of the building. Note brickwork underway.
Page Navigation
1 ... 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190